Brief Description | Priority |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Heat Exchanger - Shell & Tube Renewal | Urgent |
Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
Hot Water Boilers - DHW Renewal | Urgent |
Main Switchboards - Secondary Switchgear Renewal | Urgent |
Motor Control Centers Renewal | Urgent |
Roof Coverings - Section DF1,E1 Renewal | Urgent |
Site Civil Utilities - Underground Utilities - Site Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
B203004 Exterior Doors - Overhead and Roll - up - Renewal | High |
Branch Wiring Renewal | High |
C103009 Fittings - Millwork - Laboratories Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Gypsum Board Ceiling Renewal | High |
Ceiling Finishes - Suspended Acoustic Tiles Renewal | High |
Controls and Instrumentation - BAS Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Condenser - Rheem Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Distribution Systems -Chilled Water Distribution Systems - Piping System Renewal | High |
Domestic Water Distribution - DHW Storage Tank Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Domestic Water Distribution - Plumbing Pumps Renewal | High |
Domestic Water Distribution - Pool Balance Tanks Renewal | High |
Domestic Water Distribution - Pool Circulation and Sump Pumps Renewal | High |
Energy Supply System - Natural Gas - Piping Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Doors - Original Building and Additions 1 & 2 Renewal | High |
Exterior Windows - Remaining Single Glazed After Phase 2 Replacement Renewal | High |
Fencing & Gates - Perimeter Fence Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Metal Lockers Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Hardwood - Gymnasiums Renewal | High |
Interior Doors - Hardware Renewal | High |
Interior Doors - Original Building and Additions 1 & 2 Renewal | High |
Lighting Equipment - Exterior - Pole Renewal | High |
Lighting Equipment - Exterior - Wall Renewal | High |
Parking Lots & Roadway - Asphalt - Site Renewal | High |
Pedestrian Paving - Asphalt - Site Renewal | High |
Playing Fields - Track & Field - Unpaved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Roof Top AHU - Cool - Trane Renewal | High |
Roof Top AHU - Cool - York Renewal | High |
Sanitary Waste - Piping Renewal | High |
Stormwater Management Renewal | High |
Wall Finishes - Ceramic Tile - Washrooms, Showers Renewal | High |
Wall Finishes - Painted Block - Common Areas Renewal | High |
Wall Finishes - Painted, Classrooms, Offices Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C1030 - Fittings - Washroom Renewal | Medium |
Fire Protection Specialties - Kitchen Suppression Renewal | Medium |
Fittings - Bleachers - Gym Renewal | Medium |
Floor Finishes - Painted/Sealed Concrete - Shops, Mechanical Rooms Renewal | Medium |
Wall Finishes - Acoustic Wall Treatment - Pool Area Renewal | Medium |