Highland Middle School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
27.50 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
A101004 Standard Foundations Repairs - Parging repairs - Localized Deficiencies RenewalUrgent
B201011 Exterior Walls - Joint Sealant RenewalUrgent
B3010 Roof Coverings - BUR A RenewalUrgent
Exterior Windows RenewalUrgent
Floor Finishes - Carpet RenewalUrgent
Roof Coverings - Section BC1,BC2 RenewalUrgent
B201014 Exterior Walls - Masonry Re-pointing - Localized Deficiencies RenewalHigh
B201015 Exterior Walls - Metal Siding RenewalHigh
B2030 Exterior Doors - Hollow Metal RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C103009 Fittings - Millwork - Laboratories RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Acoustic Tile RenewalHigh
Ceiling Finishes - Steel Sprayed Acoustic Finish RenewalHigh
Cooling Generating Systems - CU #1, #2, #3 and #4 RenewalHigh
Distribution Systems - Exhaust Systems - Axial RenewalHigh
Exterior Doors - Hardware RenewalHigh
Fan Coil Units - FFH RenewalHigh
Fencing & Gates - Perimeter Fence RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Stairwells RenewalHigh
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs RenewalHigh
G204072 Playing Fields - Asphalt School Playground RenewalHigh
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Other Special Systems and Devices - Dust Collector RenewalHigh
Parking Lots - East Side of Building RenewalHigh
Pedestrian Paving - Paved-Front & Back Entrance RenewalHigh
Plumbing Fixtures - Washroom RenewalHigh
Wall Finishes - Paint RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalMedium
Fittings - Lockers RenewalMedium
Floor Finishes - Gymnasium and Auditorium Stage RenewalMedium
Interior Doors RenewalMedium
Interior Doors - Entire Building - Hardware RenewalMedium