Brief Description | Priority |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
Heating Water Distribution Systems - Heating Piping System Renewal | Urgent |
Interior Stair Construction - Original Building Renewal | Urgent |
Main Switchboards - Switchgear Renewal | Urgent |
Roof Coverings - Drainage Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Air Distribution, Heating & Cooling - Gym Duct System Renewal | High |
Air Handling Units - SF #1 Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
B201020 Exterior Walls - Cement wall board Renewal | High |
Branch Wiring Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Suspended Acoustic Panel Ceilings - Original Building, Addition 1, 2, & 3 Renewal | High |
Cooling Generating Systems - Window A/C Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Energy Supply System - Natural Gas Renewal | High |
Exterior Doors - Hardware - Original Building, Addition 1, Addition 2 and Addition 3 Renewal | High |
Exterior Doors - Hollow Metal and Wood - Original Building, Addition 1, Addition 2 and Addition 3 Renewal | High |
Exterior Windows - Older Renewal | High |
Fencing & Gates - Chain-Link Fencing Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Millwork - Original Building, Addition 1, 2, & 3 Renewal | High |
Floor Finishes - Carpet Renewal | High |
Hot Water Boilers - B #1 and B #2 Renewal | High |
Interior Doors - Metal and Wood Doors - Original & Addition 1, 2, & 3 Renewal | High |
Lighting Equipment - Exterior Renewal | High |
Parking Lots - Asphalt Paved Parking Lot Renewal | High |
Playing Fields - Asphalt Paved Schoolyard - East Building Renewal | High |
Playing Fields - Grass Surfaced - Unpaved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Roadways - Asphalt Paved Roadway Renewal | High |
Sanitary Waste Renewal | High |
Stormwater Management Renewal | High |
Structural Frame - Original Building, Addition 1, Addition 2 and Addition 3 Renewal | High |
Wall Finishes - Painted - Original Building, Addition 1, 2, & 3 Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | Medium |
Distribution Systems - Exhaust Systems - Axial Renewal | Medium |
Interior Doors - Hardware - Original Building, Addition 1, Addition 2 and Addition 3 Renewal | Medium |
Pedestrian Paving - Asphalt & Concrete Walkways Renewal | Medium |
Controls and Instrumentation - BAS Renewal | Low |
Fittings - Automotive Hoists Renewal | Low |
Fittings - Dust Extraction System Renewal | Low |