Brief Description | Priority |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Auxiliary Equipment - Heat Exchanger - Shell & Tube Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
Auxiliary Equipment - Vacuum Return and Condensate Tanks Renewal | Urgent |
C302004 Floor Finishes - Vinyl Tile Renewal | Urgent |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | Urgent |
Heating and Chilled water distribution systems - Heating & Chilled Piping Systems Renewal | Urgent |
Roof Coverings - Section A,A1,A3,D3 Renewal | Urgent |
Secondary Renewal | Urgent |
Steam Boilers - Boiler 1 Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units - #1 Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
Auxiliary Equipment - HVAC Pumps Renewal | High |
B203004 Exterior Doors - Overhead Renewal | High |
B203008 Exterior Doors - Hardware Renewal | High |
Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
C102007 Interior Doors - Hardware Renewal | High |
C103005 Fittings - Lockers Renewal | High |
C103016 Fittings - Bleachers Renewal | High |
Ceiling Finishes - Acoustic Tiles Renewal | High |
Ceiling Finishes - Suspended Ceiling Tiles Renewal | High |
Chilled Water Systems - Chiller Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Condensers Renewal | High |
Cooling Generating Systems - Packaged Terminal A/C Renewal | High |
Domestic Water Distribution - Plumbing Piping Systems Renewal | High |
Domestic Water Distribution - Sump Pumps Renewal | High |
Exhaust Systems - Exhaust Fans Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Painted Concrete Floor Renewal | High |
G204001 Fencing and Gates - Chain Link Fence Renewal | High |
G204072 Playing Fields - Asphalt Tennis Court Renewal | High |
G204072 Playing Fields - Running Track Renewal | High |
Interior Doors Renewal | High |
Interior Stair Construction Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
Pedestrian Paving - Concrete Walkway Renewal | High |
Perimeter Heating - Terminal Units Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Sinks Renewal | High |
Plumbing Fixtures - Water Fountians - Original Renewal | High |
Roof Top AHU - Heat & Cool [6] - RTU - 4 Renewal | High |
Roof Top AHU - Heat & Cool [9] - RTU - 7 Renewal | High |
Site Civil/Mechanical Utilities Renewal | High |
Stormwater Management Renewal | High |
Wall Finishes - Gyms Acoustic Wall Panels Renewal | High |
Wall Finishes - Painted Renewal | High |
Wall Finishes - Wood Wall Panels Renewal | High |
B308020 Exterior Soffits Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C103001 Fittings - Washroom Partitions - Water Closet Renewal | Medium |
C103002 Fittings - Washroom Accessories Renewal | Medium |
C103010 Fittings - Millwork - Laboratories Renewal | Medium |
C103017 Fittings - Auditorium Seating Renewal | Medium |
C302002 Floor Finishes - Terrazzo - Local Deficiencies Renewal | Medium |
Ceiling Finishes - Gypsum Board Renewal | Medium |
Ceiling Finishes - Painted Structures Renewal | Medium |
Floor Finishes - Hardwood - Gyms [Wood Strip & Parquet] Renewal | Medium |
Landscaping Renewal | Medium |
Other Heat Generating Systems - Heat&Cool [5] - RTU-3 Renewal | Medium |
Other Heat Generating Systems - Heat&Cool [7] - RTU-5 Renewal | Medium |
Other Heat Generating Systems - Heat&Cool [8] - RTU-6 Renewal | Medium |
Partitions - Localized Defeciencies Renewal | Medium |
Domestic Water Distribution - Electric Hot Water Heaters Renewal | Low |
Fittings - Window Covering Renewal | Low |
Playing Fields - Playscape + Playhut - Unpaved Renewal | Low |
Playing Fields - Unpaved Renewal | Low |
Retaining Walls Renewal | Low |
Signage Renewal | Low |