Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
61.36 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Energy Supply System - Natural Gas Piping RenewalUrgent
Heating Water Distribution Systems - Piping RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Standard Foundations Repairs - Parging repairs RenewalUrgent
Structural Frame - Localized Deficiencies RenewalUrgent
Branch Wiring - Original Building RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalHigh
C103001 Fittings - Washroom Partitions - Water Closet RenewalHigh
C103010 Fittings - Millwork - Laboratories RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Original Building RenewalHigh
Domestic Water Distribution - Plumbing Piping System RenewalHigh
Domestic Water Distribution - Pumps RenewalHigh
Exhaust Systems - Axial RenewalHigh
Exhaust Systems - Centrifugal RenewalHigh
Exterior Doors - Hardware RenewalHigh
Exterior Doors - Original Building - Hollow Metal RenewalHigh
Fittings - Millwork RenewalHigh
Lighting Equipment - Exterior Lighting RenewalHigh
Make - Up AHU - Shops RenewalHigh
Parking Lots - Paved - Asphalt RenewalHigh
Pedestrian Paving - Asphalt Paved Walkway RenewalHigh
Perimeter Heating - Terminal Units RenewalHigh
Playing Fields - Paved - Remove RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Plumbing Fixtures - Water Coolers RenewalHigh
Stormwater Management - Storm System RenewalHigh
Wall Finishes - Painted RenewalHigh
Auxiliary Equipment - Chemical Feed Systems RenewalMedium
C102007 Interior Doors - Hardware RenewalMedium
C103002 Fittings - Washroom Accessories RenewalMedium
Controls & Instrumentation - BAS RenewalMedium
Domestic Water Distribution - Electric Hot Water Heater RenewalMedium
Fencing & Gates - Site Improvements RenewalMedium
Interior Doors - Original Building - Wood RenewalMedium
Playing Fields - Unpaved RenewalMedium
Signage - Freestanding RenewalMedium
Signage - Wall Mounted RenewalMedium
Wall Finishes - Ceramic Tiles RenewalMedium
Ceiling Finishes - Wood RenewalLow
Fittings - Window Coverings - Curtains and Blinds RenewalLow
Floor Finishes - Carpet RenewalLow
Partitions - Moveable RenewalLow