Toronto District School Board
Skip to main content

Étienne Brûlé Junior School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
59.50 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Electrical Service and Distribution - Panelboards RenewalUrgent
Heating water distribution systems - Pipes and Fittings RenewalUrgent
Other Heat Generating Systems - HRU #1 and #2 RenewalUrgent
Roof Coverings - Section AB1,B1 RenewalUrgent
Roof Coverings - Section BC3,BC4 RenewalUrgent
C1030 - Fittings - Washroom RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Acoustic & Suspended Ceiling Tiles RenewalHigh
Controls and Instrumentation - Electronic/BAS RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Domestic Water Distribution - Sump Pump RenewalHigh
Exhaust Systems - Centrifugal RenewalHigh
Exterior Doors - Hollow Metal RenewalHigh
Exterior Walls - Localized Deficiency RenewalHigh
Exterior Windows - Localized Deficiency RenewalHigh
Fencing & Gates - Wrought Iron & Chain Link Fence RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Carpet RenewalHigh
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density RenewalHigh
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Make - Up AHU - MUA #1 and #2 RenewalHigh
Parking Lots - Asphalt RenewalHigh
Playing Fields - Asphalt Paved RenewalHigh
Plumbing Fixtures - Washroom RenewalHigh
Retaining Walls - Stone and Wood RenewalHigh
Sanitary Waste RenewalHigh
Site Civil/Mechanical Utilities RenewalHigh
Site Development - Concrete Exterior Stairs RenewalHigh
Structural Frame - Localized Deficiencies RenewalHigh
Wall Finishes - Painted RenewalHigh
C1010 Partitions - Localized deficiencies RenewalMedium
Domestic Water Distribution - DHWH #1 and #2 RenewalMedium
Exterior Doors - Hardware RenewalMedium
Floor Finishes - Hardwood RenewalMedium
Interior Doors - Hardware RenewalMedium
Interior Doors - Wood & Hollow Metal RenewalMedium
Pedestrian Paving - Asphalt & Concrete RenewalMedium
Roof Coverings - Section B RenewalMedium
Ceiling Finishes - Ceiling Panels RenewalLow
Fittings - Chalkboards RenewalLow
Playing Fields - Henderson & Canadian Playground Playscapes - Unpaved RenewalLow
Signage - Wall Mounted RenewalLow